This project was a Design and Construction of a new Signaling Facility to Craigieburn Stabling yard.
This was an unusual project in that it had to be built in six (6) weeks with no provision ofan extension of time.
The project was completed on time and consisted of a timber frame building with cement sheet external cladding.
This was built upon a concrete raft slab. Internally there were showers,WCs, signal room including desk, kitchen, break out area, water tanks and irragation.