The demolition and construction works are to be undertaken within the existing vacated space in the existing level 2 building area.
This project for Peninsula Health is for the development of the Frankston Day Surgery which is to be located within the existing redundant observation ward area on level 2 of the hospital on
the east side of the surgical/operating theatres recover department.
The major challenges in the project were ensuring continual clinical operations of the adjacent hospital function. This was done with the aid of experienced full time site supervision, detailed program, construction methodology and infection control hoardings. Essential services were managed to ensure nil disruption.
$1m
45 Working Days
Construction
Phil Scannell
Frankston Hospital, Peninsula