Ducon Building Solutions

Frankston Day Surgery Theatre Development

Home / Projects / Frankston Day Surgery Theatre Development

Frankston Hospital

Frankston Hospital, Peninsula

The Brief

The demolition and construction works are to be undertaken within the existing vacated space in the existing level 2 building area.

Ducon Maintenance frankston day 12
Works are to include:
  • Demolition of existing internal fit out walls, joinery and floor finishes to level 2
  • Installation of acoustic, fire rated and smoke walls as required
  • Installation of mechanical, hydraulics, fire rated and smoke walls as required
  • Internal glazing
  • Structural and secondary steel
  • Installation of selected theatre equipment

Our Response

This project for Peninsula Health is for the development of the Frankston Day Surgery which is to be located within the existing redundant observation ward area on level 2 of the hospital on
the east side of the surgical/operating theatres recover department.

The major challenges in the project were ensuring continual clinical operations of the adjacent hospital function. This was done with the aid of experienced full time site supervision, detailed program, construction methodology and infection control hoardings. Essential services were managed to ensure nil disruption.

Ducon Building Solutions is a specialist in live and complex operational environments, where a 24/7 operation is required.
Ducon Maintenance frankston day 18
Ducon Maintenance frankston day 12

LYONS ARCHITECTS

Cost

$1m

Timeframe

45 Working Days

Category

Construction

Photographer

Phil Scannell

Location

Frankston Hospital, Peninsula

Contact Us

Request A Free Quote
Ducon Building Solutions

Recent Projects

ducon building solutions

Don't Hesitate To Contact Us!

We specialise in Heritage Refurbishments and Building Conservation and have our own Painting Division – Ducon Coatings.