Chas Farquhar Complex ELC

Home / Projects / Chas Farquhar Complex ELC

 

CLIENT

Yarra City Council

The Brief

Ducon were engaged to undertake a construct-only project to build the new early learning centre (Richmond Kinder) and refurbish the existing facility. The Kinder was to remain operational throughout the project with minimum disruption.

Our Response

The Ducon team went over and above there construct only duties and assisted the client and their respective consultants through a range of design issues throughout the project. Naturally, the project was affected directly and indirectly by covid lock downs along with contaminated soil, asbestos, design oversights, lead times and material availability – however, the whole project group worked hard to deliver a fantastic build within the desired timeframe. 

3E181CAF C414 47FA 8DB9 A633CB6946A3
Ducon Building Solutions is a specialist in live and complex operational environments, where a 24/7 operation is required.
9E136F3E 4C26 4445 A0A0 8499096ABC39

CHAS FARQUHAR COMPLEX ELC

Cost

$3.1M

Timeframe

Project delivered on time

Location

Richmond

Architect

Anthony Brimley - AJB Architects Pty Ltd

Contact Us

Request A Free Quote
Ducon Building Solutions

Recent Projects

ducon building solutions

Don't Hesitate To Contact Us!

We specialise in Heritage Refurbishments and Building Conservation and have our own Painting Division – Ducon Coatings.