Metro Tunnel Network Readiness — Wayfinding Project

GOVERNMENT

Keeping passengers moving while we prepared Melbourne’s rail network for the Metro Tunnel

40032A01 1C5E 4756 B268 9CA961D1307C 1

The Brief

The opening of the Metro Tunnel changes how passengers move through Melbourne’s rail network. Metro Trains Melbourne needed wayfinding upgraded across key interchange stations — new signage and passenger-direction infrastructure installed throughout live station environments — so the network was ready for Metro Tunnel services from day one.

The constraint was the environment, not the scope: every station remained fully operational throughout. Tens of thousands of daily passengers, live platforms, and a rail network that could not pause while the work was done.

 

Our Response

Ducon delivered wayfinding upgrades across live Metro Trains environments, coordinating staged works to minimise disruption to daily rail operations. In practice that meant:

• Staged delivery across multiple live interchange stations, sequenced with Metro Trains’ operational calendar

• Works planned around passenger flows and network operations — stations stayed open, services kept running

• Coordination with station staff and network operations at every stage — the aspiration, as always: passengers should be able to pretend we’re not there at all

• Delivered on program for Metro Tunnel network readiness, with practical completion in February 2026.

Outcome

Wayfinding upgrades across the key interchange stations were completed as part of Metro Tunnel network readiness — delivered in live rail environments, on a ~10-month program, at a final contract sum of $3.86M against a $3.79M tender (variations settled within ~2% of tender).

Metro Trains Melbourne’s Project Manager completed a formal client performance report on the contract (June 2026), rating Ducon above the required standard for cooperation with client and end user, responsiveness to communication, good faith and fair dealing, management of unexpected issues, and the relevant experience of site personnel. Client referee available on request.

Ducon Building Solutions is a specialist in live and complex operational environments, where a 24/7 operation is required.
Flinders scaled

DESIGN & CONSTRUCT PROJECT

Cost

$3.86m

Timeframe

Apr 2025 - Feb 2026

Category

Rail - live operational environments

Location

Key interchange stations, metropolitan Melbourne