CLIENT
Victoria Police
The Brief
Ducon was engaged by Victoria Police to refurbish and extend the existing Lakes Entrance Police Station, improving staff facilities and the functionality of the building.
The project included two new extensions, a new Uniform Sergeant’s Office, upgraded male and female change facilities, internal refurbishment works and associated building services and external works.
The station remained operational throughout construction, so the works needed to be carefully planned around staff access, security requirements and day-to-day police operations.
Our Approach
Working within an active police station meant there was little room for disruption. Construction areas were securely separated from operational parts of the building, with controlled access, dust and vibration measures in place throughout the project.
Ducon worked closely with Victoria Police and the project consultants to plan works around the needs of the station. Service shutdowns and other disruptive activities were coordinated in advance and, where necessary, carried out outside normal operating hours.
As is often the case with refurbishment projects, a number of existing conditions only became apparent once works were underway. These included framing clashes, electrical requirements and issues within the existing mechanical system. Rather than allowing these to hold up the program, the team worked through each issue with the relevant consultants and trades and incorporated the required changes into the works.
Mechanical testing also identified existing airflow and ductwork issues in parts of the station. Additional rectification and balancing works were completed before handover to improve the performance of the system.
During the project, Victoria Police also identified an opportunity to improve privacy within the Watch House. Ducon constructed an additional wall to prevent CCTV monitors being visible to unauthorised personnel.
The Outcome
The completed project has provided Victoria Police with improved staff facilities and more functional accommodation, while allowing the station to continue operating throughout construction.
Despite additional works and unforeseen existing conditions being identified along the way, Ducon completed the project on 5 August 2026, nine days ahead of the original completion date of 14 August.
For Ducon, the project is a strong example of delivering refurbishment and extension works in a live, secure environment, where maintaining access, safety and day-to-day operations was just as important as completing the construction itself.
Victoria Police
Completed
August 2026
Location
Lakes Entrance, Victoria
Project Value
$604,716.65
Architects
Vincent Chrisp Architects
Contact Us
Ducon Building Solutions
Recent Projects
ducon building solutions
Don't Hesitate To Contact Us!
We specialise in Heritage Refurbishments and Building Conservation and have our own Painting Division – Ducon Coatings.