How Ducon plans work inside operating facilitiesFour questions before anything starts.

A phone call, a work order or a tender, the conversation is the same. Only the paperwork changes size.

Why we ask first

The drawings tell us what to build. You tell us what success looks like.

Every job arrives with a brief. On a capital project it is drawings, specifications, a contract and a date. On a call-out it is a work order. Follow either to the letter and the job gets done. What neither says is what actually matters to the people who have to live with the result, and that is the part we work out first.

Before anything starts we sit down and answer four questions. The answers become the program, the staging, the price and the measures we get judged against at the end.

The same brief, everyone in the roomWhat was agreed does not stay in one head.Site and office together. The answers to the four questions get passed on to the people who have to deliver them.
The four questions

Same four, on every job.

They are the first conversation, not a form we hand over, and they are asked in whatever order the conversation goes.

Your operations

What can't stop while we're here?

The ward, the classroom, the platform, the counter. Every facility has something that cannot be interrupted, and it is rarely the thing a drawing would suggest. We find it, write it down, and plan the works around it.

Your time

When can we actually be there?

Bell times, theatre lists, possession windows, trade hours, shift change. Your diary sets the program, not ours. This is where most of the cost and most of the risk actually sits, and it is why we ask before we price.

Your budget

What are we working with?

We make the budget go as far as it can. If something changes mid-job, and on a live site something usually does, we find it somewhere else and you still get what you came for.

Your standard

What does completed look like to you?

Your standard, not ours. Sometimes that means a full replacement. Sometimes just the door handle. It is your call, and we would rather ask than assume.

Measures of success

The answers become the measures of success.

Agreed up front, evidenced at the end. Not a satisfaction survey: the specific things that were never allowed to happen.

HealthcareNo cancelled lists.
EducationNo lost teaching days.
Emergency servicesNo turnout delayed.
RailNo possession overrun.
Every sectorNo surprises for the people who use the building.
Scale

It scales, or it isn't real.

A methodology does not fit a handshake. Four questions do. That is the whole test.

Call-out

A phone call

A conversation on site. Two minutes. “What do you actually need here?”

Maintenance

A work order

One extra question before the tools come out, and a call back to the client before anything extra gets done.

Capital works

A tender

The same four questions, evidenced: workshop, staging plan, risk register, the lot. Bigger, not different.

At scaleSame four questions, more paperwork.Planning a staged program around a live site: the tender-scale version of a two-minute conversation.

Any size of job. The same four questions.

At tender size the four questions become documents: a workshop, a staging plan, a risk register. At call-out size they are one question asked on site. Same questions, same answers evidenced at the end.

Two jobs, four questions

One hospital, one school.

Both kept operating, and both answered all four questions before the program was set.

Healthcare · Monash Health

Moorabbin Hospital: surgical theatre upgrade

Your operations
The adjoining theatres and clinical areas kept operating throughout.
Your time
About eight months, staged around the adjoining theatres, with shutdowns and noisy works planned with the hospital.
Your budget
Infection control, staging and service shutdowns were built into the method from the start, not added as extras.
Your standard
Completed meant theatres clinically operational, specialist services tested and commissioned, and infection control signed off.
The adjoining clinical areas stayed open for the whole upgrade.
Education · Victorian School Building Authority

Skipton Primary School: heritage upgrade and extension

Your operations
The only primary school in the district, with no other site to move to, kept teaching throughout.
Your time
Works were staged around the school calendar, with construction zones and trade access kept apart from student movement.
Your budget
Staging, screened site personnel and heritage detailing for the 1888 building were planned into the method from the start.
Your standard
Completed meant new administration space, refurbished learning areas and reworked grounds, delivered in stages.
The district's only primary school never lost a day of teaching.
Live environmentPassenger infrastructure, still running.Live services alongside works in progress.
Built for live environments

Where the building has to keep working while we do.

24/7 operational continuity

Hospitals, emergency services and government facilities that can never go offline. Works programmed around shift cycles, response windows and operational dependencies.

Infection prevention and control

HEPA-filtered containment, pressure differential zones and risk-stratified access, built into every healthcare project from the ICRA assessment onward.

Access and security control

Personnel screening, controlled site entry and secure zone management on police, justice, government and Defence sites.

Heritage and compliance

Heritage overlays, building code compliance and authority approvals mapped before mobilisation, not managed reactively once something is uncovered.

Talk to us before the program is locked.

Four questions before anything starts: what can't stop while we're here, when we can actually be there, what we're working with, and what completed looks like to you. The answers become the program.