What mattered, what we did, what it achieved.
A substation structure built about 10 metres from a running Metro Trains line.
More about rail & transportThe train line stayed running. Works sat about 10 metres from live track.
Rail corridor proximity, Line pump pour, Client coordination and Services penetrations.
Ducon handed over the completed substation structure, slab, cable provisions and steel portal frame for $450,000 over a twelve week program, with the adjacent train line running. Objectives were met on time, and further substation projects followed.
Altona, Galvin Tie Substation, the full profile
The constraint, the control and the outcome, in one document.
Other jobs that kept working.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.