Built around the business.
At the Arts Centre that meant lifting orchestra pit capacity from 60 players to over 100 inside a working State Theatre, built to the day a locked opera season demanded it.
More about commercialA locked opera season needed the orchestra pit capacity lifted from 60 players to more than 100, inside a working State Theatre, with the new lift mechanism shipped from France months ahead of construction.
Existing auditorium structure was removed and replaced with a secondary pit and a removable seating rostra above it, with the specialist lift engineering coordinated and signed off long before any work started on site.
A reversible secondary pit that meets full orchestra capacity for major productions and returns to audience seating the rest of the year.
Arts Centre Melbourne: State Theatre Orchestra Pit, the full profile
The constraint, the control and the outcome, in one document.
Other jobs that kept working.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.
