Rail & Transport

Elphinstone Tunnel, Lining Repairs

Masonry lining repairs in an 1859 heritage rail tunnel on a working line.

Rail & Transport

What mattered, what we did, what it achieved.

Masonry lining repairs in an 1859 heritage rail tunnel on a working line.

More about rail & transport
1
What mattered

The rail line kept running. Ducon worked to windows set by the operator.

2
What we did

24 hour program, Fatigue management, Air and light control and Work at heights.

3
What it achieved

Ducon handed over the track works and tunnel lining repairs for $700K over a two week program. The work was delivered on time and without incident, inside the time window set by the rail line operator, on a heritage tunnel dating from 1859.

Project profile

Elphinstone Tunnel, Lining Repairs, the full profile

The constraint, the control and the outcome, in one document.

Talk to us before the program is locked.

Four questions before anything starts: what can't stop while we're here, when we can actually be there, what we're working with, and what completed looks like to you.