Built around readiness.
At Corio Station that meant building a sealed PPE transition room inside a live motor room in 14 days, with crews still rolling the whole time.
More about emergency servicesA sealed, climate-controlled PPE transition room had to be built inside the existing motor room at an operational fire station, without reducing safe access for emergency response at any point across the 14-day program.
All works were planned with the user group to minimise disruption to FRV operations, sealing the new room from the engine bays it adjoins with a new fresh-air intake for climate control.
Delivered within the nominated 14-day timeframe, letting the on-duty platoon move their PPC out of a storeroom and into a purpose-built space that cuts exposure to diesel particulates.
Fire Rescue Victoria: Corio Station PPE Transition Room, the full profile
The constraint, the control and the outcome, in one document.
Other jobs that kept working.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.
