Built around readiness.
At Knox that meant building an operations centre, generator relocation included, inside an occupied office complex, on budget and on program.
More about emergency servicesA vacated first-floor tenancy in an occupied office complex needed to become a flexible operations centre, including relocating an existing generator onto a new slab with a new diesel exhaust route, while the rest of the complex stayed in use.
The fit-out was built with trade access, deliveries and services planned around the tenancies still operating, with the generator relocation resolved before mobilisation rather than on site, and architecturally detailed joinery built for flexible operational use.
Practical completion was reached on program and the fit-out was delivered under budget, inside a complex that never stopped operating.
Victoria Police: Knox Operations Centre Fit-Out, the full profile
The constraint, the control and the outcome, in one document.
Other jobs that kept working.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.
