What mattered, what we did, what it achieved.
Four DDA compliant toilet blocks at premium stations, tied into station services.
More about rail & transportWorks tied into existing station services.
DDA compliance, Level access slab, Heritage cladding match and Service connections.
Ducon handed over four DDA toilet blocks at premium stations for $300K over a 12 week program. Each has a baby change table, hand dryer, wash basin and shelving, with electrical, hydraulic and mechanical services connected to the existing station infrastructure.
Premium stations, DDA toilet blocks, the full profile
The constraint, the control and the outcome, in one document.
Other jobs that kept working.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.
