What mattered, what we did, what it achieved.
A station building brought back into use for the community that owns it.
More about rail & transportThe station building was unused before the works.
Design compliance, Structural repair, Accessible provision and Program control.
The refurbished station building was handed over for $215,000 over 12 weeks, fit for community and commercial use. The building was vacant through the works, so there was no operating facility to protect.
Yarragon, Station Building, the full profile
The constraint, the control and the outcome, in one document.
Other jobs that kept working.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.
