At Frankston's 2 West that meant refurbishing a mental health unit with public safety and infection control held as clinical priorities, while the ward kept running around the works.
More about healthcareA level 2 mental health unit needed demolition and refurbishment while the hospital remained fully operational, raising both public safety and infection control across every route the works touched.
Works were confined to vacated level 2 spaces so the sequence protected the parts of the unit still in clinical use, with public safety weighted as a clinical consideration and infection control maintained across the whole program, not just the demolition phase.
The refurbishment was delivered inside 70 working days with the mental health unit continuing to operate around it throughout.
Frankston Hospital: 2 West Refurbishment, the full profile
The constraint, the control and the outcome, in one document.
Other jobs that kept working.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.