Built around learning.
At Hampton Park that meant turning a dead garden space into a genuine outdoor classroom, on a fixed $39,000 budget, in four weeks.
More about educationA fixed, small budget had to fund a genuine outdoor teaching space out of an underused back-of-house garden, leaving no contingency to correct a wrong design call later.
The design was developed to the fixed budget alongside the architect rather than priced after the fact, using layered planting and durable materials, coloured concrete, cypress, marine-grade stainless, granite and Corten steel, built for daily student use.
A functioning teaching and gathering space delivered in four weeks, given the same design attention as a capital project despite its $39,000 scope.
Hampton Park Primary School: Outdoor Learning Space, the full profile
The constraint, the control and the outcome, in one document.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.
