What mattered, what we did, what it achieved.
A steel and timber pedestrian bridge built inside an operating wildlife sanctuary.
More about educationThe wildlife sanctuary stayed operating. Endangered flora and fauna stayed on site.
Environmental plan, Low-disruption method, Design team contact and Ground and weather.
Ducon handed over the pedestrian bridge for $179K over a 20 day program, on time and on budget to the client's satisfaction. The sanctuary remained operating throughout.
La Trobe University, Sanctuary Bridge, the full profile
The constraint, the control and the outcome, in one document.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.
