What mattered, what we did, what it achieved.
Excavated a new level under a six-room medical centre that kept operating.
More about healthcareThe medical centre kept operating throughout. Clinical teams relocated to the new areas.
Decant sequence, Excavation control, Continuous operation and Client liaison.
Ducon handed over the extension and the refurbished original rooms for $600,000 over a four-month program. The medical centre operated throughout, with clinical teams moving into the new areas before the existing facility was refurbished.
Doncaster, Temple Hills Medical Centre, the full profile
The constraint, the control and the outcome, in one document.
Other jobs that kept working.
Get the document
Leave your details if you would like us to follow up, or skip the form and download now. No phone call unless you ask for one.
Thanks, your download is starting.
