Construction capabilities, Melbourne and AdelaideWhat we build, and the standard we build it to.

From a $12M hospital ward to a broken drop bolt at a kindergarten. The same four questions run on both, which is why the small jobs get the same discipline as the large ones.

Where the finish standard came from

Between 2002 and 2012 Ducon built architecturally designed clubhouses, galleries and private residences with Melbourne architects, work where the junction, the shadow line and the material were the whole point. Cranbourne Golf Club took HIA Small Project of the Year in 2009.

That period is not history on a shelf. It is where the standard came from, and it is the standard that goes into a ward that has to open on Monday. When we ask what completed looks like to you, this is what we are able to answer with.

Design intent protectedChanges proposed to the architect with an alternative, never resolved on site and reported afterwards.
Trades selected for finishSubcontractors chosen against the detail they have to deliver, not the rate they quote.
Junctions documentedThe details that define a building are set out, reviewed and signed before they are built.

Maintenance and minor works

A separate discipline, not a smaller version of construction. Reactive call-outs, programmed maintenance, work orders and minor capital works, delivered with the same four questions and the same reporting.

See maintenance and minor works

Where we work

Victoria and South Australia (postal address 25 Grenfell Street, Adelaide), with projects historically delivered in Queensland.

Find the right expert

Filter by sector, or open a profile. These are the people who would run your job, not an org chart.

Capability statements

Capability statement library

Every capability statement. One search.

Filter by sector, preview the document, then download it, no digging through a generic enquiry form to get the right file.

Project size

We deliver projects from $500,000 to $20 million. State government work is capped by our Victorian Government Pre-Qualification (Construction Supplier Register) at $8M; outside that register the range runs to $20M.

Plan the right delivery approach.

Start with what the project has to protect, and we will build the plan around it.